WTG Foundations
Excavation, reinforcement, anchor cage setting and mass concreting to the OEM foundation drawing.
Balance-of-plant and erection support for wind farms.
WTG foundations, internal roads, crane platforms, erection support and cabling — the civil and mechanical scope that gets a turbine standing and spinning.

Wind sites punish loose planning: a crane pad that settles or a road that fails in the monsoon stops erection for weeks. We handle the balance-of-plant scope around the turbine — approach and internal roads, hardstands, foundations, cable trenching and erection support — with the heavy lifting backed by our own 900 tonne class crawler crane and trained rigging crews.
Excavation, reinforcement, anchor cage setting and mass concreting to the OEM foundation drawing.
Roads built for blade trailers and crawler crane transit, including culverts and turning radii.
Compacted, load-checked platforms sized for main and tailing crane operations.
Rigging crews, tailing cranes, tools and supervision supporting the OEM erection team.
Internal cable trenching, laying, backfilling and coordination up to the pooling substation.
Punch-list closure, electrical and mechanical completion assistance and site restoration.



We study the scope, site conditions, timelines and manpower or equipment load before quoting anything.
Method statements, EHS plan, statutory documentation and a mobilisation schedule you sign off on.
Deployed teams work under our own supervisors, with daily progress and safety reporting to your site head.
Checklists, test records and as-built documentation close the scope, with support through the defect-liability period.
Yes. We own and crew a SANY SCC9000A-1 900 tonne class crawler crane, and arrange tailing and support cranes for the erection sequence.
Yes. Foundations, roads and hardstands can be contracted on their own, or bundled with erection support as one balance-of-plant package.
Road and hardstand work accounts for drainage and soaked-condition bearing capacity, and the sequence is planned so critical lifts fall outside the wettest weeks wherever the schedule allows.
We mobilise across India, with regular deployment in Gujarat, Rajasthan, Maharashtra, Madhya Pradesh, Bihar and Uttar Pradesh.
Send the scope, location and timeline. You get a written scope, a mobilisation plan and a firm rate — usually within two working days.